Warning (512): SplFileInfo::openFile(/var/www/html/mines.millsbomb.com/tmp/cache/models/myapp_cake_model_default_mines): failed to open stream: No such file or directory [CORE/src/Cache/Engine/FileEngine.php, line 395]
Warning (512): SplFileInfo::openFile(/var/www/html/mines.millsbomb.com/tmp/cache/models/myapp_cake_model_default_mines) [splfileinfo.openfile]: failed to open stream: Success [CORE/src/Cache/Engine/FileEngine.php, line 395]
Warning (512): _cake_model_ cache was unable to write 'default_mines' to Cake\Cache\Engine\FileEngine cache [CORE/src/Cache/Cache.php, line 244]
Finlay Screening Plant

Finlay Screening Plant

Abandoned Nonmetal Mine near Ferris Dallas TX

Finlay Screening Plant Info

Surface Metal Mine specialising in Sand, Industrial NEC, operated by APAC Texas Inc

Directions to Finlay Screening Plant

From Dallas go 18 miles south on I-45. Take exit 268 toward I45/Malloy Bridge Rd. 2.3 miles turn left onto Malloy Bridge Rd. 1.8 miles turn right onto Parkinson Rd. 2.7 miles turn left onto Wolf Springs Rd. 2200 E. Wolf Springs Rd.

 

Finlay Screening Plant Data

Id 4104669
Current Mine Name Finlay Screening Plant
Coal Metal Ind M
Current Mine Type Surface
Current Mine Status Abandoned
Current Status Dt 08/09/2010
Current Controller Id M06183
Current Controller Name CRH PLC
Current Operator Id L16618
Current Operator Name APAC Texas Inc
State TX
Bom State Cd 41
Fips Cnty Cd 113
Fips Cnty Nm Dallas
Cong Dist Cd
Company Type Corporation
Current Controller Begin Dt 05/16/2007
District M5
Office Cd M5671
Office Name Dallas TX Field Office
Assess Ctrl No 000182598
Primary Sic Cd 144600
Primary Sic Sand, Industrial NEC
Primary Sic Cd 1 1446
Primary Sic Cd Sfx 00
Secondary Sic Cd
Secondary Sic
Secondary Sic Cd 1
Secondary Sic Cd Sfx
Primary Canvass Cd 7
Primary Canvass Nonmetal
Secondary Canvass Cd
Secondary Canvass
Current 103i
Current 103i Dt
Portable Operation Y
Portable Fips St Cd 48
Days Per Week 0
Hours Per Shift 0
Prod Shifts Per Day 0
Maint Shifts Per Day 0
No Employees 0
Part48 Training Y
Longitude 96.541111
Latitude 32.525277
Avg Mine Height
Mine Gas Category Cd
Methane Liberation
No Producing Pits
No Nonproducing Pits
No Tailing Ponds 0
Pillar Recovery Used N
Highwall Miner Used N
Multiple Pits N
Miners Rep Ind N
Safety Committee Ind N
Miles From Office 25
Directions To Mine From Dallas go 18 miles south on I-45. Take exit 268 toward I45/Malloy Bridge Rd. 2.3 miles turn left onto Malloy Bridge Rd. 1.8 miles turn right onto Parkinson Rd. 2.7 miles turn left onto Wolf Springs Rd. 2200 E. Wolf Springs Rd.
Nearest Town Ferris
 

Feedback / Update

Leave your comments, questions and feedback on this mine below. You can also include up to date contact information and correct any listing errors or omissions.